Recent News

Disaster Management Plan of East Kalimantan 2012-2017
29 November 2011

The purpose of concept mapping in the work of RPB (Disaster Plan) is to gather existing information and verified dealing with disaster as the basis for the formulation of the index layer used in the mapping of disaster risk. Mapping format presented each sheet with the theme / type of disaster that occurred at the scene. Disaster risk map contains information about the facts, trends, and factors that supported the spatial maps, graphs, tables, and pictures / photos becana information.


MORE
Environmental Monitoring Survey of Repowering Muara Karang Steam Power Plant Unit 1, 2 & 3
29 November 2011

 

The Muara Karang Power Plant Unit is one of the PT. PJB power plant unit which are operated 5 units of Steam Power Plant (SPP) and 1 unit of Steam-Gas Power Plant (SGPP) Project. UP Muara Karang Power located on the north of DKI Jakarta, which on the East side of Karang River estuary is the Steam Power Plant Project units, while for the location of Gas Steam Power Plant is on the West side of Karang River estuary.
more 


Feasibility Study Minahasa Gas Powerplant (Peaking) (1x25 MW)
29 November 2011

 

In order to reduce the use of fuel oil at power plants owned by PT PLN (Persero) and still fluctuating crude oil world prices, the Governments of the current policy with regard to the development of power plants is emphasized on the use of renewable primary energy sources (Renewable Energy) and non-renewable energy sources that have a large enough reserves such as coal and natural gas (natural gas).
more 


Feasibility Study of Riau CFSPP (2 x 100 MW) Located at Pekan Baru (1061) PT. PLN (Persero) Jasa Enjiniring.
29 November 2011

 

Indonesia's economic growth, particularly in the areas of Riau Province requires the supply of electrical energy is very large. Riau province currently experiencing a prolonged deficit of electrical energy, so every day on a rolling blackout. This means that electricity deficit has occurred even if only for the fulfillment of basic load (base load), so that the construction of a large-capacity power plant becomes a very important program.
more 


Advisory Management Consulting Master Planning of Water Supply System (SPAM) Region II
29 November 2011

 

In general, the purpose of implementation of Management Consultants Master Planning Advisory SPAM Region II is to maintain the quality of the work of RI (Master Plan) SPAM that is being implemented by the provincial and regency / municipal government, evaluate the results and implementation of activities as well as reporting to the Central Government and provide advice to the development.
more 



NEXT | LAST 1 - 5