Project Information
Identifikasi dan Pemetaan Kebutuhan Sumber Air Baku Untuk Air Minum di Kota Sedang
Preparation of implementation strategies and methodologies work, team mobilization.
Preliminary studies and literature studies related to raw water.
Primary and secondary data collection surveys in the form of surface raw water, groundwater.
Study and analysis of data on the potential of raw water for drinking water.
Preparation of training modules, Needs analysis raw water for drinking water.
Preparation of criteria for the availability of potential raw water to drinking water.
Identify the potential and conditions of raw water source needs for drinking water.
Mapping the potential of raw water and raw water needs for drinking water in a medium city.
Creation of GIS application programs and maps of the potential and conditions of raw water source needs.
Coordination with relevant agencies to equalize perceptions of work results in the field.
Create a report.