Project Information
Survei dan Soil Investigasi TL 150 KV PLTP Maumere - Larantuka
In the event to fulfill the electricity in Java area and in line with PLN planning as written on RUPTL, PT. Pembangkitan Jawa Bali (“PJB”) will develop a Combine Cycle Power Plant (CCPP) Jawa-3 with capacity of 800 MW. To prepare the development of this CCPP, PJB consider the necessity of perform a technical and economic study, and also plan a system and equipment design. As one of the study, the site investigation must be perform. The Site Investigation is aimed at obtaining knowledge of the topographic, bathymetric, hydro-dynamic and soil investigation. The project is located in UP (Unit Pembangkitan) PJB Gresik, Gresik Subregency, Gresik Regency, East Java Province.