Project

Project Information

Survei dan Soil Investigasi TL 150 KV PLTP Maumere - Larantuka

CLIENT PT. PLN (Persero)
LOCATION Maumere - Larantuka (NTT)
YEARS 2013
TYPE Survey and Investigation.

In the event to fulfill the electricity in Java area and in line with PLN planning as written on RUPTL, PT. Pembangkitan Jawa Bali (“PJB”) will develop a Combine Cycle Power Plant (CCPP) Jawa-3 with capacity of 800 MW. To prepare the development of this CCPP, PJB consider the necessity of perform a technical and economic study, and also plan a system and equipment design. As one of the study, the site investigation must be perform. The Site Investigation is aimed at obtaining knowledge of the topographic, bathymetric, hydro-dynamic and soil investigation. The project is located in UP (Unit Pembangkitan) PJB Gresik, Gresik Subregency, Gresik Regency, East Java Province.

Survei dan Soil Investigasi TL 150 KV PLTP Maumere - Larantuka
Survei dan Soil Investigasi TL 150 KV PLTP Maumere - Larantuka
Survei dan Soil Investigasi TL 150 KV PLTP Maumere - Larantuka