Project Information
Identifikasi dan Pemetaan Kebutuhan Sumber Air Baku Untuk Air Minum di Kota Sedang
- Preparation of implementation strategies and methodologies work, team mobilization.
- Preliminary studies and litelatur studies related to raw water.
- Primary and secondary data collection surveys in the form of surface raw water, groundwater.
- Study and analysis of data on the potential of raw water for drinking water.
- Preparation of training modules, Needs analysis raw water for drinking water.
- Preparation of criteria for the availability of potential raw water to drinking water.
- Identify the potential and conditions of raw water source needs for drinking water.
- Mapping the potential of raw water and raw water needs for drinking water in a medium city.
- Creation of GIS application programs and maps of the potential and conditions of raw water source needs.
- Coordination with relevant agencies to equalize perceptions of work results in the field.
- Create a report.