Project Information
Survei dan Soil Investigasi T/L 150 KV PLTP Maumere - Larantuka
PT. PLN through APLN intends to carry out a SUTT 150 kV development study from Maumere to Larantuka, East Nusa Tenggara Province which was carried out by PT. PLN (Persero) UIP KITRING Nusa Tenggara. The development project is expected to contribute to increasing the capacity of electricity distribution to meet the supply of electricity in the province of East Nusa Tenggara. Therefore, have to do the Measurement Survey Work and Soil Investigation of the Maumere – Larantukan 150 kV SUTT Pathaway to produce investigation result data as soil bearing capacity on the site plan tower, which later need to be used as a basic to design foundation. In order to support increased reliability, quality and availability of electricity in the existing electricity system. Site location are in Sikka Regency and East Flores Regency, Flores Island, East Nusa Tenggara Province. Length of the transmission line between Maumere and Larantuka is around 150 Km. Scope of work are includes : Drilling, Cone Penetration Test and Laboratory Test.