Identifikasi dan Pemetaan Kebutuhan Sumber Air Baku Untuk Air Minum di Kota Sedang
Preparation of implementation strategies and methodologies work, team mobilization. Preliminary studies and literature studies related to raw...
Supervisi Konstruksi Sistem Penyediaan Air Minum (SPAM) Jawa Barat (Paket-01)
Supervision of physical implementation in the field Monitor construction profiling, initial measurements, material quality, etc. Coord...
Engineering Services for Muara Karang Gas Power Plant Project (1.020 MW).
The power station (the project site) is located in 10 km north-northeast of the central part of Jakarta city and 12 km east of Jakarta airport (Soekar...
Evaluation Consultant (EC) Midterm Impact Evaluation II, Community Based Rehabilitation and Reconstruction Project (CSRRP) in Earthquake Afected Areas of D.I. Yogyakarta and Central Java Reconstruction Fund (JRF) Grant TF. 090014-IND.
The objective of this study is to measure the impact of the CSRRP project (through indicators) on these dimensions of settlement reconstruction and re...
Supervisi Konstruksi Sistem Penyediaan Air Minum (SPAM) Jawa Barat
Mobilization of personnel and equipment, discussions with related parties and data collection. Fieldwork: coordination, supervising measuremen...
Environmental and Social Impact Assessment on the Coal Fired Power Plant (PLTU) Bintan 3 x 33 MW in Tanjung Pinang.
At present in Bintan Regency, the availability of electrical energy sources is not able to meet the increasing electricity needs especially in Bintan...
Large DAM Inspection of Wadaslintang and Sempor.
Wadaslintang dam, located in Wonosobo Regency (Central Java), was constructed in 1987. The dam is 125 m high, with a reservoir volume of 440 million m...
Technical Assistance in Supporting Bridging Program of Dam Operational Improvement and Safety Project (DOISP).
The scope includes providing extension services for institutional capacity building and training for the Dam Safety Project, which is funded by the Wo...
Bantuan Teknis Penyehatan PDAM (Kabupaten Purwakarta, Karawang dan Bekasi)
Preparation of schedules and work plans. Methodology and Strategy for The Implementation of Work. Data Collection of Work Results in t...
Environmental and Social Impact Assessment (AMDAL) on Package 7 Toll Road for Probolinggo - Banyuwangi and Simpang Susun Waru - Tanjung Perak II.
In the direction of infrastructure management in the Java-Bali region, one of the things related to the development of toll roads is to develop a road...